NUT 2.2.2_3a & Beta3
-
I am having problems with the times not being calculated out because it is not finding what the load of the UPS is. The load line is left blank. If I plug it into a windows box, the times and loads get calculated out correctly. I have a APC Pro 350 plugged into a soekris net5501 with beta 3 loaded on a sata hd.