Netgate Discussion Forum
    • Categories
    • Recent
    • Tags
    • Popular
    • Users
    • Search
    • Register
    • Login

    Two Novembers in RRD graphs.

    Scheduled Pinned Locked Moved webGUI
    4 Posts 3 Posters 2.3k Views
    Loading More Posts
    • Oldest to Newest
    • Newest to Oldest
    • Most Votes
    Reply
    • Reply as topic
    Log in to reply
    This topic has been deleted. Only users with topic management privileges can see it.
    • dotdashD
      dotdash
      last edited by

      Just noticed some strangeness in the RRD graph labels on a 1.2 system. Checked a couple of different machines and it seems present in both full and embedded installs.
      When looking at the RRD graphs, the six month view looks like:
      Aug,Sep,Oct,Nov,Nov,Dec
      The year view looks like:
      Oct,Nov,Nov,Dec,Jan,Mar,Apr,May,Jun,Jul,Aug,Sep,Oct,Nov,Jan

      Checked a 1.2.2 full install (upgraded) and a fresh 1.2.2 embedded, and the labels are the same- two Novembers.

      1 Reply Last reply Reply Quote 0
      • E
        Emab
        last edited by

        I found that I've two October in one of my pf…
        I'll look at the others...

        LOL

        status_rrd_graph_img.php.png
        status_rrd_graph_img.php.png_thumb

        1 Reply Last reply Reply Quote 0
        • C
          cmb
          last edited by

          We've heard of this before, I've never seen it on any of mine. It's strange, there isn't anything in pfSense that tells rrdtool what months to display, it handles that all on its own.

          1 Reply Last reply Reply Quote 0
          • E
            Emab
            last edited by

            So I think it`s an rrd tool related bug…

            It's the latest versione of rrdtool?

            We should post this info to the developers of rrdtool?

            1 Reply Last reply Reply Quote 0
            • First post
              Last post
            Copyright 2025 Rubicon Communications LLC (Netgate). All rights reserved.