Netgate Discussion Forum
    • Categories
    • Recent
    • Tags
    • Popular
    • Users
    • Search
    • Register
    • Login

    Sync Communication error occurred

    Scheduled Pinned Locked Moved L2/Switching/VLANs
    2 Posts 1 Posters 333 Views
    Loading More Posts
    • Oldest to Newest
    • Newest to Oldest
    • Most Votes
    Reply
    • Reply as topic
    Log in to reply
    This topic has been deleted. Only users with topic management privileges can see it.
    • S
      sshami
      last edited by

      I am newbie in Pfsense and setup pfsense as software in cluster with two VMs. Carp is working fine even i can see one as a master node and secondary as Backup if i restart first node second node become master so far high availability looks good.

      Setup details:
      1 WAN interface
      1 Sync interface (Synchronize Interface)
      1 Virtual IP for carp
      Configured: SystemHigh Availability Sync

      On the master node i am getting following error Notices :
      Communications error occurred
      A communications error occurred while attempting to call XMLRPC method host_firmware_version: @ 2021-04-25 00:03:09
      A communications error occurred while attempting to call XMLRPC method host_firmware_version: @ 2021-04-25 00:03:10

      Other question is how to verify my sync is working properly, i thought to create one user on master node but its not automatically sync new user to backup node even firewall rules.

      S 1 Reply Last reply Reply Quote 0
      • S
        sshami @sshami
        last edited by

        @sshami I can't ping backup Sync intrerface IP from Master node.

        1 Reply Last reply Reply Quote 0
        • First post
          Last post
        Copyright 2025 Rubicon Communications LLC (Netgate). All rights reserved.