Netgate Discussion Forum
    • Categories
    • Recent
    • Tags
    • Popular
    • Users
    • Search
    • Register
    • Login
    Introducing Netgate Nexus: Multi-Instance Management at Your Fingertips.

    Auto change order rules

    Scheduled Pinned Locked Moved Firewalling
    5 Posts 3 Posters 1.5k Views
    Loading More Posts
    • Oldest to Newest
    • Newest to Oldest
    • Most Votes
    Reply
    • Reply as topic
    Log in to reply
    This topic has been deleted. Only users with topic management privileges can see it.
    • A Offline
      A.jayce
      last edited by

      Version 2.3.1-RELEASE-p5 (amd64)

      My Case : we have 5 rules on LAN.

      Rules number 1 : Rules A
      Rules number 2 : Rules B
      Rules number 3 : Rules C
      Rules number 4 : Rules D
      Rules number 5 : Rules E

      but after 1-2hours Number rules auto change

      Rules number 1 : Rules C
      Rules number 2 : Rules E
      Rules number 3 : Rules A
      Rules number 4 : Rules B
      Rules number 5 : Rules D

      How to fix not change numerical order of rules.

      Thanks

      1 Reply Last reply Reply Quote 0
      • C Offline
        cmb
        last edited by

        What do you mean by "rules number"? The order they appear in the GUI, or?

        1 Reply Last reply Reply Quote 0
        • BBcan177B Offline
          BBcan177 Moderator
          last edited by

          Are you using pfBlockerNG?

          If yes, then you can't manually re-order the rules as each cron run will re-order them to how they are defined in the package… You can change the "Rule Order" setting in the pfBlockerNG General Tab.

          "Experience is something you don't get until just after you need it."

          Website: http://pfBlockerNG.com
          Twitter: @BBcan177  #pfBlockerNG
          Reddit: https://www.reddit.com/r/pfBlockerNG/new/

          1 Reply Last reply Reply Quote 0
          • A Offline
            A.jayce
            last edited by

            @cmb:

            What do you mean by "rules number"? The order they appear in the GUI, or?

            yes, that is very important on "rules number".
            my ideal :
            (rules number 1)- only open connect to pfsense through port : 22 80 (default rules)
            (rules number 2)- Allow VIP (3 end-user) to fully connect.
            (rules number 3)- deny all ip lan (Facebook, youtube and media site).
            (rules number 4)- open all ip sub of lan connect internet through port 80
            (rules number 5)- open rules allow part. (details: ip of end-user )
            (rules number 6)- allow ip (10 user) only connect to list ip server our company. not connect to any site or ip.

            I using order appear in the GUI (order rules in GUI - DRAG to Order). when i save and apply that. after 1-2 hours rule's automated change.

            1 Reply Last reply Reply Quote 0
            • A Offline
              A.jayce
              last edited by

              @BBcan177:

              Are you using pfBlockerNG?

              If yes, then you can't manually re-order the rules as each cron run will re-order them to how they are defined in the package… You can change the "Rule Order" setting in the pfBlockerNG General Tab.

              yes, i have using pfBlockerNG.

              you have guideline of change setting in the pfBlockerNG General Tab. Please share me.

              Thank you  BBcan177.

              1 Reply Last reply Reply Quote 0
              • First post
                Last post
              Copyright 2026 Rubicon Communications LLC (Netgate). All rights reserved.