Netgate Discussion Forum
    • Categories
    • Recent
    • Tags
    • Popular
    • Users
    • Search
    • Register
    • Login

    Switch configuration

    Scheduled Pinned Locked Moved L2/Switching/VLANs
    3 Posts 2 Posters 443 Views
    Loading More Posts
    • Oldest to Newest
    • Newest to Oldest
    • Most Votes
    Reply
    • Reply as topic
    Log in to reply
    This topic has been deleted. Only users with topic management privileges can see it.
    • Z
      zifxify93
      last edited by

      Which of the following pictures is correct ?
      Should I setup lacp (picture 2) or connect them together like picture 1 for redundancy ?

      1.png

      2.png

      1 Reply Last reply Reply Quote 0
      • DerelictD
        Derelict LAYER 8 Netgate
        last edited by

        It depends on how it is configured. Impossible to say by just looking at what is physically connected to what.

        Chattanooga, Tennessee, USA
        A comprehensive network diagram is worth 10,000 words and 15 conference calls.
        DO NOT set a source address/port in a port forward or firewall rule unless you KNOW you need it!
        Do Not Chat For Help! NO_WAN_EGRESS(TM)

        1 Reply Last reply Reply Quote 0
        • Z
          zifxify93
          last edited by

          I would like to install xcp-ng as hypervisor and also have redundancy in case one of the nodes or one of the switches fails. I haven't done this before. css326 should serve mainly for making the connections with the patch panel and as failover if the crs326 switch would fail.
          Is the following plausible to setup or what would you recommended ?

          3.png

          1 Reply Last reply Reply Quote 0
          • First post
            Last post
          Copyright 2025 Rubicon Communications LLC (Netgate). All rights reserved.