Netgate Discussion Forum
    • Categories
    • Recent
    • Tags
    • Popular
    • Users
    • Search
    • Register
    • Login

    Voucher sync to branch offices

    Scheduled Pinned Locked Moved Captive Portal
    1 Posts 1 Posters 423 Views
    Loading More Posts
    • Oldest to Newest
    • Newest to Oldest
    • Most Votes
    Reply
    • Reply as topic
    Log in to reply
    This topic has been deleted. Only users with topic management privileges can see it.
    • W
      weisker
      last edited by

      Hi,

      if I remember correctly, with some 2.4 version we were able to sync vouchers to a manually defined list of hosts.
      With this, we were able to generate vouchers at the main office and they could be used in each branch office.
      The sync back to the master node is still present of the branch offices, but the forward sync is now done only to the HA member.

      This was a nice feature, because some branches are so near to each other, that guests may roam between offices.

      Also the MAC bypass list was synchronized from the primary node to all offices.

      Is there any way possible to do a global sync again?

      1 Reply Last reply Reply Quote 0
      • First post
        Last post
      Copyright 2025 Rubicon Communications LLC (Netgate). All rights reserved.