Netgate Discussion Forum
    • Categories
    • Recent
    • Tags
    • Popular
    • Users
    • Search
    • Register
    • Login

    Drag (and drop) Firewall Rules / Change Order on mobile device?

    Scheduled Pinned Locked Moved webGUI
    1 Posts 1 Posters 281 Views 1 Watching
    Loading More Posts
    • Oldest to Newest
    • Newest to Oldest
    • Most Votes
    Reply
    • Reply as topic
    Log in to reply
    This topic has been deleted. Only users with topic management privileges can see it.
    • B Offline
      bn1980
      last edited by

      Using Chrome on a Google Pixel (Android), is it possible to change the order of firewall rules in pfSense?

      1 Reply Last reply Reply Quote 0
      • First post
        Last post
      Copyright 2026 Rubicon Communications LLC (Netgate). All rights reserved.