Netgate Discussion Forum
    • Categories
    • Recent
    • Tags
    • Popular
    • Users
    • Search
    • Register
    • Login

    high availability w/ redundant layer 2 switches causing loop on my test network

    Scheduled Pinned Locked Moved HA/CARP/VIPs
    19 Posts 4 Posters 2.1k Views
    Loading More Posts
    • Oldest to Newest
    • Newest to Oldest
    • Most Votes
    Reply
    • Reply as topic
    Log in to reply
    This topic has been deleted. Only users with topic management privileges can see it.
    • johnpozJ
      johnpoz LAYER 8 Global Moderator @se_marc
      last edited by

      You can keep the dumb switches, but you have dumb switch A connecting them, and then you connect them together again with a cable = LOOP!

      An intelligent man is sometimes forced to be drunk to spend time with his fools
      If you get confused: Listen to the Music Play
      Please don't Chat/PM me for help, unless mod related
      SG-4860 24.11 | Lab VMs 2.8, 24.11

      se_marcS 1 Reply Last reply Reply Quote 0
      • se_marcS
        se_marc @johnpoz
        last edited by

        @johnpoz sorry, i'm a bit confused. i didn't include dumb switch A in the most recent diagram.

        DerelictD 1 Reply Last reply Reply Quote 0
        • DerelictD
          Derelict LAYER 8 Netgate @se_marc
          last edited by

          @se_marc This is how you would do it.

          This cannot be done with "cheap" gear.

          Some gear that can do this that used to be expensive is now not very expensive on eBay, etc.

          HA+LACP.png

          Chattanooga, Tennessee, USA
          A comprehensive network diagram is worth 10,000 words and 15 conference calls.
          DO NOT set a source address/port in a port forward or firewall rule unless you KNOW you need it!
          Do Not Chat For Help! NO_WAN_EGRESS(TM)

          1 Reply Last reply Reply Quote 0
          • johnpozJ
            johnpoz LAYER 8 Global Moderator
            last edited by johnpoz

            @se_marc said in high availability w/ redundant layer 2 switches causing loop on my test network:

            i didn't include dumb switch A in the most recent diagram.

            My point was what you posted as how to set it up, what not what you had before.

            A dumb switch is not a ISP device that would not bridge the connections together..

            Your drawing showing 2 isp, you can not replace that isp device with a dumb switch - which becomes really a wire.. And now you have 2 wires connecting 2 dumb switches - big fat loop!

            To derelicts point - what your trying to do with a HA setup is not meant to be done with cheap dumb home gear. If you want to play with a lab to do this sort of stuff, you need equipment that can do a min amount of enterprise level sort of stuff. Which stp is common on even the cheapest of smart switches.

            Or yeah get on ebay and get some enterprise gear for cheap..

            An intelligent man is sometimes forced to be drunk to spend time with his fools
            If you get confused: Listen to the Music Play
            Please don't Chat/PM me for help, unless mod related
            SG-4860 24.11 | Lab VMs 2.8, 24.11

            se_marcS 1 Reply Last reply Reply Quote 0
            • se_marcS
              se_marc @johnpoz
              last edited by se_marc

              @johnpoz @Derelict I haven't given up just yet lol. I took some time to think things over and I feel like I'm getting closer. The managed switches will be ubiquiti so RSTP will be enabled. To my understanding that means ports 3 & 4 on Managed Switches B and D will be blocked unless something happens the the either ports 5 & 6 on Managed Switch A or one of the WAN ports on pfSense Main. same would go for the second ISP. Would i need to connect Managed Switch A to Managed Switch B, and then C to D?

              HA Fault Tolerance LAGG A (1).png

              johnpozJ 1 Reply Last reply Reply Quote 0
              • johnpozJ
                johnpoz LAYER 8 Global Moderator @se_marc
                last edited by johnpoz

                Trying to lagg into 2 disconnected switches not something that is normally an option. When you lagg into multiple switches like you have it draw. The switches are part of stack.

                Are your A and B, and then C,D stacked?

                Notice the drawing Derelict posted.

                An intelligent man is sometimes forced to be drunk to spend time with his fools
                If you get confused: Listen to the Music Play
                Please don't Chat/PM me for help, unless mod related
                SG-4860 24.11 | Lab VMs 2.8, 24.11

                se_marcS 1 Reply Last reply Reply Quote 0
                • se_marcS
                  se_marc @johnpoz
                  last edited by

                  @johnpoz crud, to my knowledge unifi switches do not support official stacking but a common trend is to connect them together via SFP ports and then relying on RSTP. This causes half speed of the LAGG router ports.

                  johnpozJ 1 Reply Last reply Reply Quote 0
                  • johnpozJ
                    johnpoz LAYER 8 Global Moderator @se_marc
                    last edited by

                    Then its not really a lagg now is it ;) hehehe

                    An intelligent man is sometimes forced to be drunk to spend time with his fools
                    If you get confused: Listen to the Music Play
                    Please don't Chat/PM me for help, unless mod related
                    SG-4860 24.11 | Lab VMs 2.8, 24.11

                    DerelictD 1 Reply Last reply Reply Quote 0
                    • DerelictD
                      Derelict LAYER 8 Netgate @johnpoz
                      last edited by

                      People call all sorts of things a "lagg."

                      I consider everything except proper LACP which generally requires either stacking or multi-chassis trunking, etc.

                      Chattanooga, Tennessee, USA
                      A comprehensive network diagram is worth 10,000 words and 15 conference calls.
                      DO NOT set a source address/port in a port forward or firewall rule unless you KNOW you need it!
                      Do Not Chat For Help! NO_WAN_EGRESS(TM)

                      johnpozJ 1 Reply Last reply Reply Quote 0
                      • AndyRHA
                        AndyRH
                        last edited by AndyRH

                        I wanted to play a network guy on TV, so I bought one of these on eBay. It will do everything in your drawing in one switch. Great for play time.

                        Aruba S2500-48P-US <- has 10Gb SFP+ ports, POE, VLANs, semi-loud fans... All the enterprise features for under $200.

                        o||||o
                        7100-1u

                        1 Reply Last reply Reply Quote 0
                        • johnpozJ
                          johnpoz LAYER 8 Global Moderator @Derelict
                          last edited by

                          @derelict said in high availability w/ redundant layer 2 switches causing loop on my test network:

                          People call all sorts of things a "lagg."

                          Very true - its a kind of a catch all.. I was thinking lacp, which yeah you need a stack..

                          An intelligent man is sometimes forced to be drunk to spend time with his fools
                          If you get confused: Listen to the Music Play
                          Please don't Chat/PM me for help, unless mod related
                          SG-4860 24.11 | Lab VMs 2.8, 24.11

                          1 Reply Last reply Reply Quote 0
                          • First post
                            Last post
                          Copyright 2025 Rubicon Communications LLC (Netgate). All rights reserved.