Netgate Discussion Forum
    • Categories
    • Recent
    • Tags
    • Popular
    • Search
    • Register
    • Login
    Introducing Netgate Nexus: Multi-Instance Management at Your Fingertips.

    How can make Dependency between 2 Vhid Group

    Scheduled Pinned Locked Moved HA/CARP/VIPs
    1 Posts 1 Posters 317 Views 1 Watching
    Loading More Posts
    • Oldest to Newest
    • Newest to Oldest
    • Most Votes
    Reply
    • Reply as topic
    Log in to reply
    This topic has been deleted. Only users with topic management privileges can see it.
    • S
      sina
      last edited by

      hi
      i have 2 virtual pfsense on 2 Esxi host distinct form each other and have stacked 2960x cisco switches which host are connected to them .
      my virtual pfsense's have 3 interfaces that all of them using Direct I/O path and have seprate Vswitches.
      my problem is when i want test Carp for failover.
      when i disconnect virtual pfsense from vsphere web client every thing is OK and Fail over occur perfectly . but when i shut Down Up-links from cisco Switches
      Asymmetric condition occur.
      how can make dependency between 2 Vhid Group when one of them fail another one also fail and traffic goes to backup pfsense.
      plz Help Me

      1 Reply Last reply
      Reply Quote 0

      Hello! It looks like you're interested in this conversation, but you don't have an account yet.

      Getting fed up of having to scroll through the same posts each visit? When you register for an account, you'll always come back to exactly where you were before, and choose to be notified of new replies (either via email, or push notification). You'll also be able to save bookmarks and upvote posts to show your appreciation to other community members.

      With your input, this post could be even better 💗

      Register Login
      • First post
        Last post
      Copyright 2026 Rubicon Communications LLC (Netgate). All rights reserved.
      Privacy Policy · Cookie Policy