Netgate Discussion Forum
    • Categories
    • Recent
    • Tags
    • Popular
    • Users
    • Search
    • Register
    • Login

    apcupsd causes restart

    Scheduled Pinned Locked Moved UPS Tools
    4 Posts 2 Posters 462 Views
    Loading More Posts
    • Oldest to Newest
    • Newest to Oldest
    • Most Votes
    Reply
    • Reply as topic
    Log in to reply
    This topic has been deleted. Only users with topic management privileges can see it.
    • V
      Vancejo1
      last edited by

      When I stop the apcupsd service and run apctest then select 10 battery calibration. It cause my router to reboot after reporting the calibration was aborted. My battery is only 1 year old, and all the other tests passed. APC backups 750.

      V 1 Reply Last reply Reply Quote 0
      • stephenw10S stephenw10 moved this topic from General pfSense Questions on
      • V
        Vancejo1
        last edited by

        I'm running the 24.11-RELEASE (arm64) on a Netgate SG-1100.

        1 Reply Last reply Reply Quote 0
        • V
          viragomann @Vancejo1
          last edited by

          @Vancejo1 said in apcupsd causes restart:

          When I stop the apcupsd service and run apctest then select 10 battery calibration. It cause my router to reboot after reporting the calibration was aborted.

          Is it really rebooting? Or does the UPS cut the power?
          Check the logs to get sure.
          I've seen the latter already, but with old batteries, however.

          V 1 Reply Last reply Reply Quote 0
          • V
            Vancejo1 @viragomann
            last edited by

            @viragomann
            Yes it definitely is rebooting, but not immediately. I was able to try it 3 more times before putty quit responding.

            Here is what shows in putty...

            Select function number: 10

            This test instructs the UPS to perform a battery calibration
            operation and reports the result when the process completes.
            The battery level must be at 100% and the load must be at least
            10% to begin this test.

            Battery level is 100% -- OK
            Load level is 14% -- OK
            Clearing previous self test result...CLEARED

            The battery calibration should automatically end
            when the battery level drops below about 25%.
            This process can take minutes or hours, depending on
            the size of your UPS and the load attached.

            Initiating battery calibration...INITIATED

            Waiting for calibration to complete...
            To abort the calibration, press ENTER.

            CALIBRATION COMPLETED
            Result of last self test: ABORTED

            1. Test kill UPS power
            2. Perform self-test
            3. Read last self-test result
            4. View/Change battery date
            5. View manufacturing date
            6. View/Change alarm behavior
            7. View/Change sensitivity
            8. View/Change low transfer voltage
            9. View/Change high transfer voltage
            10. Perform battery calibration
            11. Test alarm
            12. View/Change self-test interval
              Q) Quit

            Select function number: 10

            This test instructs the UPS to perform a battery calibration
            operation and reports the result when the process completes.
            The battery level must be at 100% and the load must be at least
            10% to begin this test.

            Battery level 99% is insufficient to run test.

            1. Test kill UPS power
            2. Perform self-test
            3. Read last self-test result
            4. View/Change battery date
            5. View manufacturing date
            6. View/Change alarm behavior
            7. View/Change sensitivity
            8. View/Change low transfer voltage
            9. View/Change high transfer voltage
            10. Perform battery calibration
            11. Test alarm
            12. View/Change self-test interval
              Q) Quit

            Select function number: 10

            This test instructs the UPS to perform a battery calibration
            operation and reports the result when the process completes.
            The battery level must be at 100% and the load must be at least
            10% to begin this test.

            Battery level 99% is insufficient to run test.

            1. Test kill UPS power
            2. Perform self-test
            3. Read last self-test result
            4. View/Change battery date
            5. View manufacturing date
            6. View/Change alarm behavior
            7. View/Change sensitivity
            8. View/Change low transfer voltage
            9. View/Change high transfer voltage
            10. Perform battery calibration
            11. Test alarm
            12. View/Change self-test interval
              Q) Quit

            Select function number: 10

            This test instructs the UPS to perform a battery calibration
            operation and reports the result when the process completes.
            The battery level must be at 100% and the load must be at least
            10% to begin this test.

            1 Reply Last reply Reply Quote 0
            • First post
              Last post
            Copyright 2025 Rubicon Communications LLC (Netgate). All rights reserved.